Reading Time: 4 minutes
ATAP / Offgrid

Powering Malaysian Industry with Precision Solar

Reduce your factory’s electricity costs by up to 30–50% with a solar system designed around your actual energy usage.
 
Take advantage of available tax incentives while improving long-term cost control — with solutions engineered for performance, reliability, and scale.

Maximise Returns with GITA Tax Incentives

Take advantage of Malaysia’s Green Investment Tax Allowance (GITA) to significantly reduce your upfront investment and improve overall ROI.

Up to 38% Government Tax Incentives with GITA

Eligible companies can benefit from up to 38% tax incentives on solar investments under Capital Allowance and Malaysia’s Green Investment Tax Allowance (GITA), available until 31 December 2026.

TNB Bill Reduction

With competitive financing and low upfront investment, most factories achieve strong ROI with a typical payback period of 3–5 years — followed by 20+ years of significantly reduced electricity costs.

Boost Your ESG Performance with Clean Energy

Reduce CO₂ emissions, meet ESG reporting requirements, and strengthen your company’s sustainability profile — increasingly important when working with multinational clients.

Engineered for Malaysian Climates

Our systems utilise Tier-1 bifacial modules designed for high humidity and diffuse light conditions common in Malaysia— ensuring consistent energy generation all year round.

IP68 Rated

30 Years

15 Years

10 Years

Proven Results from Real Installations

See how businesses across Johor and Melaka are reducing electricity costs with solar systems designed for performance and ROI.

Skudai, Johor Bahru

Kanix Industries (M) Sdn Bhd

214.63kWp System • Commissioned 2025

MONTHLY SAVING

RM 8,379

ROI TIME

2.53 Years

Bandar Seri Alam Fasa VII, Masai

Lipidchem Sdn Bhd

232.41 kWp System • Commissioned 2025

MONTHLY SAVING

RM 10,973

ROI TIME

2.16 Years

Muar, Johor

Hong Lih Trading

45.38 kWp System • Commissioned 2025

MONTHLY SAVING

RM 1,900

ROI TIME

3.24 Years

Ready to See How Much You Can Save?

Get a preliminary solar proposal and ROI estimate within 48 hours — no site visit required.

 

Just submit your latest TNB bill, and we’ll handle the rest.

1. Submit Your Bill

Upload your latest TNB bill — we’ll use it to understand your energy usage.

2. Remote Analysis

Our team assesses your roof and system potential using satellite data.

3. Receive Your Proposal

Get a clear breakdown of system size, estimated savings, and ROI.

Get My Business Solar Proposal

Drop your file here or click here to upload You can upload up to 1 files.

Trusted by Business Owners

We pride ourselves on delivering top-tier solar installations and exceptional customer service. Don’t just take our word for it—see what your neighbors are saying about their switch to clean energy and 5-star experiences.

Frequently Asked Questions

Most C&I clients in Malaysia can reduce 20%–50% of their monthly TNB electricity bill, depending on roof size and operating hours.
Factories with daytime-heavy usage typically achieve the highest savings.

The investment cost depends on system size, roof condition, and electricity consumption.

Most C&I solar projects in Malaysia are designed based on ROI instead of fixed price, with typical payback around 3–5 years.

We provide a detailed proposal showing system cost breakdown, estimated savings, payback period and tax incentive impact (CA & GITA).

Yes. Businesses may be eligible for:

  • Capital Allowance (CA) – allows you to claim tax deductions on solar investment
  • Green Investment Tax Allowance (GITA) – tax incentives for approved green technology investments

These incentives can significantly improve project ROI and reduce overall investment cost.

No. Solar installation is planned to be non-disruptive to daily operations.
Work is typically scheduled in phases to ensure minimal or zero impact on production activities.

Solar is most suitable for businesses with:

  • High daytime electricity consumption
  • Large roof or warehouse space
  • Stable long-term operational sites

A site assessment is required to confirm feasibility and system design optimization.